Wheatheart S2000 Post Pounder Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Machines spéciales Wheatheart S2000 Post Pounder. Wheatheart S2000 Post Pounder User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 58
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Part Number: IM15 R1
Revised: Nov/11
Read this manual before using product. Failure
to follow instructions and safety precautions can
result in serious injury, death, or property
damage. Keep manual for future reference.
Wheatheart
POST POUNDER
S2000 MODEL
ASSEMBLY & OPERATION MANUAL
Vue de la page 0
1 2 3 4 5 6 ... 57 58

Résumé du contenu

Page 1 - Wheatheart

Part Number: IM15 R1Revised: Nov/11Read this manual before using product. Failure to follow instructions and safety precautions can result in serious

Page 2

1. INTRODUCTION WHEATHEART - POST POUNDER1.5. PTO KIT S2000 MODEL10 IM15 R11.5. PTO KITThe optional PTO Kit (Part Number 2311153) provides the S2000 P

Page 3 - TABLE OF CONTENTS

WHEATHEART - POST POUNDER 1. INTRODUCTIONS2000 MODEL 1.6. HAMMER BALLAST KITIM15 R1 111.6. HAMMER BALLAST KITThe S2000 Post Pounder is equipped with a

Page 4 - 4 IM15 R1

1. INTRODUCTION WHEATHEART - POST POUNDER1.6. HAMMER BALLAST KIT S2000 MODEL12 IM15 R1

Page 5 - 1.Introduction

WHEATHEART - POST POUNDER 2. SAFETY FIRSTS2000 MODEL IM15 R1 132.Safety FirstThe Safety Alert symbol to the left identifies important safety messages

Page 6 - 6 IM15 R1

2. SAFETY FIRST WHEATHEART - POST POUNDER2.1. GENERAL SAFETY S2000 MODEL14 IM15 R12.1. GENERAL SAFETYImportant: This general safety section includes i

Page 7 - 1.2. FRAME ASSEMBLY

WHEATHEART - POST POUNDER 2. SAFETY FIRSTS2000 MODEL 2.2. TRANSPORT & PLACEMENT SAFETYIM15 R1 15• Follow good shop practices:• keep service area c

Page 8 - 1.3. MAST ASSEMBLY

2. SAFETY FIRST WHEATHEART - POST POUNDER2.3. OPERATION SAFETY S2000 MODEL16 IM15 R1Figure 2.2 Work Safety Areas2.3. OPERATION SAFETY• Have another pe

Page 9 - 1.4. HUGGER ARM ASSEMBLY

WHEATHEART - POST POUNDER 2. SAFETY FIRSTS2000 MODEL 2.4. MAINTENANCE SAFETYIM15 R1 172.4. MAINTENANCE SAFETY• Before applying pressure to a hydraulic

Page 10 - 1.5. PTO KIT

2. SAFETY FIRST WHEATHEART - POST POUNDER2.6. SAFETY DECAL LOCATIONS S2000 MODEL18 IM15 R12.6. SAFETY DECAL LOCATIONS• Keep safety decals clean and le

Page 11 - 1.6. HAMMER BALLAST KIT

WHEATHEART - POST POUNDER 2. SAFETY FIRSTS2000 MODEL 2.6. SAFETY DECAL LOCATIONSIM15 R1 19Figure 2.3 Safety Decal Locations

Page 12 - 12 IM15 R1

This product has been designed and constructed according to general engineering standardsa. Other local regulations may apply and must be followed by

Page 13 - 2.Safety First

2. SAFETY FIRST WHEATHEART - POST POUNDER2.6. SAFETY DECAL LOCATIONS S2000 MODEL20 IM15 R1

Page 14 - 2.1. GENERAL SAFETY

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.1. PRE-ASSEMBLYIM15 R1 213.AssemblyThe following procedures and instructions are necessary to ensur

Page 15 - TRANSPORT LOCK BARS

3. ASSEMBLY WHEATHEART - POST POUNDER3.2. ASSEMBLING THE S2000 POST POUNDER S2000 MODEL22 IM15 R13.2. ASSEMBLING THE S2000 POST POUNDERImportant: Alwa

Page 16 - 2.3. OPERATION SAFETY

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.2. ASSEMBLING THE S2000 POST POUNDERIM15 R1 232. Connect the jack stands to the frame assembly, an

Page 17 - 2.5. HYDRAULIC SAFETY

3. ASSEMBLY WHEATHEART - POST POUNDER3.2. ASSEMBLING THE S2000 POST POUNDER S2000 MODEL24 IM15 R1Figure 3.3 Connecting Mast Assembly to the Frame Asse

Page 18 - 2.6. SAFETY DECAL LOCATIONS

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.2. ASSEMBLING THE S2000 POST POUNDERIM15 R1 253.2.3. CONNECT THE HUGGER ARM AND CYLINDER TO THE MAS

Page 19 - IM15 R1 19

3. ASSEMBLY WHEATHEART - POST POUNDER3.2. ASSEMBLING THE S2000 POST POUNDER S2000 MODEL26 IM15 R13. Secure hugger brackets to the mast assembly with

Page 20 - 20 IM15 R1

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.2. ASSEMBLING THE S2000 POST POUNDERIM15 R1 273. Any extra space in the ballast box can be shimmed

Page 21 - 3.Assembly

3. ASSEMBLY WHEATHEART - POST POUNDER3.3. INSTALLING THE PTO KIT S2000 MODEL28 IM15 R13.3. INSTALLING THE PTO KITThe optional PTO Kit provides the S20

Page 22 - REPARE THE FRAME ASSEMBLY

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.3. INSTALLING THE PTO KITIM15 R1 293.3.1. INSTALLING THE PTO KIT OIL FILTER ASSEMBLY1. Connect the

Page 23 - BALLAST BOX

TABLE OF CONTENTSWHEATHEART - POST POUNDER S2000 MODEL IM15 R1 31. Introduction ...

Page 24

3. ASSEMBLY WHEATHEART - POST POUNDER3.3. INSTALLING THE PTO KIT S2000 MODEL30 IM15 R13.3.2. INSTALLING THE PTO KIT HYDRAULIC TANK1. Position the hydr

Page 25 - ASSEMBLY

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.3. INSTALLING THE PTO KITIM15 R1 31Figure 3.12 Fastening the Hydraulic TankHYDRAULIC TANK TANK STRA

Page 26 - 3.2.4. INSTALL HAMMER BALLAST

3. ASSEMBLY WHEATHEART - POST POUNDER3.3. INSTALLING THE PTO KIT S2000 MODEL32 IM15 R13.3.3. INSTALLING THE PTO PUMP SUPPORT1. Facing the three-point

Page 27

WHEATHEART - POST POUNDER 3. ASSEMBLYS2000 MODEL 3.3. INSTALLING THE PTO KITIM15 R1 333.3.4. CONNECTING PTO KIT HYDRAULIC HOSESUse the following proce

Page 28 - 3.3. INSTALLING THE PTO KIT

3. ASSEMBLY WHEATHEART - POST POUNDER3.3. INSTALLING THE PTO KIT S2000 MODEL34 IM15 R13.3.5. FILLING THE HYDRAULIC TANKFor general operation, Wheathea

Page 29

WHEATHEART - POST POUNDER 4. TRANSPORTS2000 MODEL IM15 R1 354.TransportFollow this procedure when placing the unit into its transport position:1. Sl

Page 30

4. TRANSPORT WHEATHEART - POST POUNDER S2000 MODEL36 IM15 R1

Page 31

WHEATHEART - POST POUNDER 5. PLACEMENTS2000 MODEL IM15 R1 375.PlacementFollow this procedure when placing pounder into its working position: 1. R

Page 32

5. PLACEMENT WHEATHEART - POST POUNDER S2000 MODEL38 IM15 R1

Page 33

WHEATHEART - POST POUNDER 6. OPERATIONS2000 MODEL 6.1. PRE-OPERATION CHECKLISTIM15 R1 396.Operation 6.1. PRE-OPERATION CHECKLISTEfficient and saf

Page 34 - ILLING THE HYDRAULIC TANK

WHEATHEART - POST POUNDER S2000 MODEL4 IM15 R16.5. Operating The S2000 Post Pounder ...

Page 35 - 4.Transport

6. OPERATION WHEATHEART - POST POUNDER6.2. DRIVES S2000 MODEL40 IM15 R1• Ensure that the pounder is attached to the tractor 3-point hitch with hitch p

Page 36 - 36 IM15 R1

WHEATHEART - POST POUNDER 6. OPERATIONS2000 MODEL 6.3. LOCKOUTSIM15 R1 416.2.2. PTO KIT DRIVEIf you use the tractor’s PTO to drive the hydraulic pump

Page 37 - 5.Placement

6. OPERATION WHEATHEART - POST POUNDER6.4. START-UP AND BREAK-IN S2000 MODEL42 IM15 R16.4.1. STARTUPBEFORE STARTING:• Read power unit operational manu

Page 38 - 38 IM15 R1

WHEATHEART - POST POUNDER 6. OPERATIONS2000 MODEL 6.5. OPERATING THE S2000 POST POUNDERIM15 R1 436.5. OPERATING THE S2000 POST POUNDERNote: Remove and

Page 39 - 6.Operation

6. OPERATION WHEATHEART - POST POUNDER6.5. OPERATING THE S2000 POST POUNDER S2000 MODEL44 IM15 R1Figure 6.1 Securing a Post with the Hugger6.5.2. DRIV

Page 40 - 6.2. DRIVES

WHEATHEART - POST POUNDER 6. OPERATIONS2000 MODEL 6.5. OPERATING THE S2000 POST POUNDERIM15 R1 452. For large posts: raise ballast box as much as nee

Page 41 - 6.4. START-UP AND BREAK-IN

6. OPERATION WHEATHEART - POST POUNDER6.5. OPERATING THE S2000 POST POUNDER S2000 MODEL46 IM15 R1

Page 42 - 6.4.1. STARTUP

WHEATHEART - POST POUNDER 7. MAINTENANCES2000 MODEL IM15 R1 477.MaintenanceBefore performing any maintenance on this unit: • shut off and remove key

Page 43 - OADING A POST IN THE HUGGER:

7. MAINTENANCE WHEATHEART - POST POUNDER7.1. CHANGING THE OIL FILTER (PTO KIT) S2000 MODEL48 IM15 R17.1. CHANGING THE OIL FILTER (PTO KIT)Change the h

Page 44 - 6.5.2. DRIVING A POST:

WHEATHEART - POST POUNDER 7. MAINTENANCES2000 MODEL 7.3. REPLACING THE MAST SEALIM15 R1 497.3. REPLACING THE MAST SEALThe mast seal kit consists of th

Page 45 - 6.5.3. SHUTDOWN

WHEATHEART - POST POUNDER 1. INTRODUCTIONS2000 MODEL IM15 R1 51.IntroductionCongratulations on your choice of a Wheatheart S2000 Post Pounder to comp

Page 46 - 46 IM15 R1

7. MAINTENANCE WHEATHEART - POST POUNDER7.3. REPLACING THE MAST SEAL S2000 MODEL50 IM15 R1

Page 47 - 7.Maintenance

WHEATHEART - POST POUNDER 8. STORAGES2000 MODEL IM15 R1 518.StorageTo ensure a long, trouble-free life, the following procedure should be followed wh

Page 48 - 48 IM15 R1

8. STORAGE WHEATHEART - POST POUNDER S2000 MODEL52 IM15 R1

Page 49 - 7.3. REPLACING THE MAST SEAL

WHEATHEART - POST POUNDER 9. TROUBLESHOOTINGS2000 MODEL IM15 R1 539.TroubleshootingPROBLEM CAUSE SOLUTIONValve is leakingLoose/cracked fittings Tight

Page 50 - 50 IM15 R1

9. TROUBLESHOOTING WHEATHEART - POST POUNDER S2000 MODEL54 IM15 R1

Page 51 - 8.Storage

WHEATHEART - POST POUNDER 10. APPENDIXS2000 MODEL 10.1. HYDRAULIC SYSTEMIM15 R1 5510.Appendix10.1. HYDRAULIC SYSTEMFigure 10.1 shows the standard S200

Page 52 - 52 IM15 R1

10. APPENDIX WHEATHEART - POST POUNDER10.1. HYDRAULIC SYSTEM S2000 MODEL56 IM15 R1Figure 10.2 shows the S2000 PTO Kit Hydraulic diagram, and Table 10.

Page 53 - 9.Troubleshooting

LIMITED WARRANTYWheatheart warrants to the buyer that the new machinery is free from defects in material and workmanship.This warranty is only effecti

Page 54 - 54 IM15 R1

Wheatheart Part of the Ag Growth International Inc. GroupP.O. Box 151902 South St. Road 32Union City, IndianaPhone: 1-800-354-9502 or 1-765-964

Page 55 - 10.Appendix

1. INTRODUCTION WHEATHEART - POST POUNDER1.1. FEATURE OVERVIEW AND OPTIONS S2000 MODEL6 IM15 R11.1. FEATURE OVERVIEW AND OPTIONSThe S2000 Post Pounder

Page 56 - 56 IM15 R1

WHEATHEART - POST POUNDER 1. INTRODUCTIONS2000 MODEL 1.2. FRAME ASSEMBLYIM15 R1 71.2. FRAME ASSEMBLYThe frame assembly is shipped with all hydraulics

Page 57 - LIMITED WARRANTY

1. INTRODUCTION WHEATHEART - POST POUNDER1.3. MAST ASSEMBLY S2000 MODEL8 IM15 R11.3. MAST ASSEMBLYThe mast assembly mounts on the frame assembly pivot

Page 58

WHEATHEART - POST POUNDER 1. INTRODUCTIONS2000 MODEL 1.4. HUGGER ARM ASSEMBLYIM15 R1 91.4. HUGGER ARM ASSEMBLYThe hugger arm assembly installs on the

Commentaires sur ces manuels

Pas de commentaire